Onion store, 55m × 27m, near Peterborough

A full groundwork package for a new crop store on the Cambridgeshire fen edge: site strip, foundations, underground drainage and service ducts, sub-base and the concrete floor.

The job

What we
built

A full groundwork package for a new crop store on the Cambridgeshire fen edge: site strip, foundations, underground drainage and service ducts, sub-base and the concrete floor.

Drone view of foundation pads set out for a 55m by 27m onion store near Peterborough

Cambridgeshire

Onion store, 55m × 27m, near Peterborough

Length55.0 m
Width27.0 m
Floor areaapprox. 1,485 m²
CountyCambridgeshire

On site

How it was
installed

A full groundwork package for a new crop store on the Cambridgeshire fen edge: site strip, foundations, underground drainage and service ducts, sub-base and the concrete floor.

At 1,485 square metres this is one of the larger crop stores we have built. The drone and time-lapse footage on our home page was filmed on this job — the aerial shot of the pad grid gives a fair sense of the scale before any steel went up.

Onion stores put demands on a floor that a general purpose building never does. Boxes get stacked high, loaded machinery runs through the doors all day through the lifting season, and the whole floor gets washed down between crops. Every one of those is a groundwork decision rather than a concrete one.

Underground drainage and service ducting were installed as part of our works and checked before the pour, so nothing had to be cut into a finished slab. Falls were set out from a datum at the start rather than chased during the pour, which is the difference between a floor that drains and a floor with a puddle in the middle of it every wash-down.

The steel frame sits on 44 sets of holding-down bolts. Each set was positioned on a timber template against the setting out, checked, and cast in — all 44 poured and installed in a single morning. A bolt a few millimetres out is a problem the steel erectors inherit, so this is the stage where accuracy pays for itself.

  • ScopeSite strip, foundations, drainage, ducting, sub-base and floor
  • DuctingService ducts and crossings installed and checked before the pour
  • DrainageChannels and gullies positioned for wash-down between crops
  • FloorPower-floated to a dense, flat, sweepable finish
  • AccessConcrete apron tied into the internal slab at the doorways
  • Steel bases44 sets of holding-down bolts set on templates and cast in

Qualifications

Who turns up
on your site

Our own operators, on our own plant, with the certification to run it.

Start a project

Send us the drawings.
We'll price the work.

Tell us the site, the sector and roughly when you want to start. We'll come back with a clear price and a realistic programme — no jargon, no surprises on the final invoice.

YardUnit 37, Eastern Way Ind Est,
Bury St Edmunds IP32 7AB

Send an enquiry

Or call the office on 01284 750436.