Unit 37, Eastern Way Ind Est, Bury St Edmunds IP32 7AB T 01284 750436 M 07795 572226 office@jkconstructionltd.com
JK Construction (East Anglia) Ltd — groundwork and concrete contractors, Bury St Edmunds

Agricultural buildings

Farm workshop buildings

Foundations, floors and hardstanding for farm workshops. A workshop floor gets more abuse than almost anything else on a farm — machinery in and out daily, oil, wash-down, and weight standing in one spot.

What's involved

Hard-wearing floors
that stay flat

Workshops are working buildings. The floor takes point loads, spills and traffic from one end of the year to the other.

A workshop slab spends its life under machinery. Tractors and telehandlers park on it, jacks and stands sit on it, and it gets washed down and swept constantly. A floor that dusts, cracks at the joints or holds water in the middle becomes a liability very quickly.

We build the full groundwork package — excavation, foundations, sub-base and slab — with reinforcement and slab thickness worked out around what's actually going to stand on it, and joints positioned where they belong rather than wherever the pour happened to finish.

Doorways and the transition from internal floor to external apron get particular attention. That edge is the first thing to break up on a badly built workshop.

  • FoundationsPads and strips to suit the frame and the ground conditions
  • SlabThickness and reinforcement specified around the machinery using it
  • JointsPositioned deliberately, sawn early to control shrinkage
  • EdgesDoorway thresholds and slab edges detailed to take the traffic
  • DrainageWash-down drainage and falls planned before the pour
  • FinishPower-floated dense surface that resists dusting

Our approach

We think about how
the floor gets used

Before work starts, not after the concrete has gone off.

Just as importantly, we understand how these floors are actually going to be used. Doorways, high-traffic areas, machinery routes, drainage runs, service ducts, slab edges and transitions between internal and external concrete all need consideration before work starts.

Our experience means we approach agricultural concrete as a complete working floor rather than simply an area of concrete to be laid. The aim is to construct something that is practical, correctly drained and capable of standing up to the environment and machinery it will be exposed to for many years.

More on how we approach agricultural concrete

Recent job

One we've
just finished

Workshop buildings at Littleport and near Ely.

Power-floated concrete workshop floor at Littleport, Cambridgeshire, reflecting the roof lights

Littleport, Cambridgeshire

Workshop building floor

A power-floated floor through six open-fronted bays, pumped in with the frame already up.

TypeWorkshop
BaysSix
CountyCambridgeshire

Read the full project

Job sheet

Building
Farm workshop
Location
Near Ely, Cambridgeshire
Ground
Fen — formation proof-rolled
Slab
Power-floated, dowelled joints
Scope
Groundwork, drainage, hardstanding
Status
Completed

Near Ely, Cambridgeshire

Workshop building

A new farm workshop: foundations, drainage, hardstanding and a hard-wearing power-floated slab detailed around the doorways and machinery routes.

TypeFarm workshop
ScopeGroundwork & concrete
StatusCompleted

Read the full project

Qualifications

Who turns up
on your site

Our own operators, on our own plant, with the certification to run it.

Start a project

Send us the drawings.
We'll price the work.

Tell us the site, the sector and roughly when you want to start. We'll come back with a clear price and a realistic programme — no jargon, no surprises on the final invoice.

YardUnit 37, Eastern Way Ind Est,
Bury St Edmunds IP32 7AB

Send an enquiry

Or call the office on 01284 750436.