Agricultural buildings

Potato and onion store groundwork

Crop stores ask more of a floor than most farm buildings. We build the bases, ducting and concrete for potato and onion stores across East Anglia — including a 55m × 27m onion store near Peterborough.

What's involved

Ducting and falls,
built in from the start

Crop stores carry services under the slab and have to be washed down between seasons. Both need designing in before anything is poured.

A crop store floor takes the same punishment as a grain store — loaded machinery, boxes stacked high, constant traffic through the doors — with the added complication of ducting and drainage running beneath it.

We install underground drainage, service ducts and crossings as part of the groundwork, so they are in and checked before the concrete goes down. Cutting services into a finished slab is slow, expensive and never as good.

Falls matter more here than almost anywhere. Stores get washed out, and water must reach a channel or gulley without standing in the middle of the floor. We set those levels out at the beginning rather than trying to chase them during the pour.

  • Set outLevels checked against a datum before excavation
  • DuctingService ducts and crossings installed and checked before the pour
  • DrainageChannels and gullies positioned for wash-down, not as an afterthought
  • Sub-baseCompacted in layers to suit the loadings above
  • FloorPower-floated finish that sweeps and washes clean
  • ApronExternal concrete tied into the internal slab at the doorways

Our approach

Falls and levels
set out properly

Whether water is heading for a channel, a gulley or an external area, it gets planned at the outset.

Falls and levels are particularly important on farm projects. Whether we're directing water towards drainage channels, gullies or external areas, we set the levels out properly from the outset rather than trying to create falls during the pour.

We understand the importance of getting the complete build-up right — suitable sub-base preparation and compaction, slab thickness and concrete specification, reinforcement where required, correct falls, drainage and joint positioning. We also regularly install underground drainage, service ducts and crossings, so these can all be incorporated into the works before the concrete is poured.

More on how we approach agricultural concrete

Recent job

One we've
just finished

An onion store near Peterborough — the job in the video on our home page.

Drone view of pad and strip foundations excavated across the footprint of an onion store near Peterborough

Near Peterborough, Cambridgeshire

Onion store — 55m × 27m

Full groundwork package for a new onion store: site strip, foundations, underground drainage and service ducts, sub-base and the concrete floor. The drone and time-lapse footage on our home page was filmed on this job.

Length55.0 m
Width27.0 m
Floor areaapprox. 1,485 m²

Read the full project

Qualifications

Who turns up
on your site

Our own operators, on our own plant, with the certification to run it.

Start a project

Send us the drawings.
We'll price the work.

Tell us the site, the sector and roughly when you want to start. We'll come back with a clear price and a realistic programme — no jargon, no surprises on the final invoice.

YardUnit 37, Eastern Way Ind Est,
Bury St Edmunds IP32 7AB

Send an enquiry

Or call the office on 01284 750436.